Registered To
John Wheeler
Registry No.
001702
WAMO-N-C075-S02
- Face
- North
- Level
- 75
- Position
- 2
- Elevation
- 148 ft–150 ft
- Marble
- Texas, Baltimore County, Maryland marble
- Campaign
- 1848-1854
Your Place
In The Monument
North Face · Level 75 · ≈ 148 Ft

Your Stone
Level 75 Masonry
12 Stones
Stone 2 · Position 2 of 12
WAMO-N-C075-S02
Part of a monument. Part of a greater story.
The Monument Behind Your Stone: One Shaft, Two Building Eras

The Story In The Stone
Construction began in 1848, stopped near 152 feet in 1854, and resumed under federal engineers before the shaft was completed in 18841,4.
The visible change in the marble records that interruption: different quarry beds and decades of unequal weathering made the building eras legible on the exterior6,7,8.
Masonry levels, construction campaigns, and marble sources follow National Park Service and Library of Congress records. Individual stone width and position are reconstructed from the documented taper and are not an as-built record. A registration is commemorative and conveys no ownership of the monument.
